Pre-Requisites:
If non-computing equipment is powered by the same U.P.S. as the data processing system, it must be galvanically isolated by installing an isolating transformer.
The customer is responsible for supplying the entire electrical installation, from the power delivery station up to the connections under the machines. This installation must comply with standards in force and BULL specifications. |