Go to main contents page Special conditions for this system
For DPS 9000/9xx systems, and their peripherals, the installation of a raised floor is mandatoryThis is designed to allow for the necessary cooling, via the plenum space, of the various elements which go to make up the systemThis system ensures good air conditioning circulation in the room.
Furthermore, the plenum space serves as technical duct for laying the power supply and data transmission cables.