This Site Preparation guide deals with the new computing system you are about to acquire. This guide comprises:
This guide is also intended for use by the various technicians who may be required to contribute their skills in the above-mentioned fields.
The installation study for your system should be carried out in collaboration with your teams during an upcoming visit by our local Customer Service Department.
All the standards mentioned in this guide are applicable in France. They serve as reference standardsfor equivalent standards to be complied with in other countries. These standards should be applied in the relevant country.
The installations of ancillary equipment and the construction of a data processing
centre should comply with:
in the country
where the system is to be installed and with the customer's requirements. As an example,
in France, the low voltage electrical installation must comply with standard NF C15.100 of
May 1991 and the Decree of 14 November 1988 ("Worker protection").
The customer assumes the cost of the work necessary to attain the required safety level and meet the continuity of operation requirement.
This guide is provided for information only. Bull shall not be liable for any damage arising from its application. Corrections or modifications may be made without notice to the content of this guide. These modifications or corrections will be highlighted in subsequent updates.
Copyright
Data Processing Site Preparation Manual.
Copyright (c) Groupe Bull 1998. All rights reserved.