Go to main contents page Special conditions for this system
For DPS 7000 two-cabinet systems capable of being extended to include a third cabinet, and its peripherals, the installation of a raised floor in which the data transmission and power supply cables should be laid is essential.
Furthermore, the plenum space serves as a ventilation duct. This system is designed to deliver cooled air to the appropriate equipment and ensure good air conditioning circulation in the room.