Use this dialog box to select the playback level of the operations to be included in the Audit Trail Report.
The individual playback levels are listed and explained below.
Playback LevelSelect the desired playback level to include in the report from the menu provided:
Critical
When selected, all critical severity operations will be displayed.
When selected, all critical and high severity operations will be displayed.
When selected, all critical, high, and medium severity operations will be displayed.
When selected, all critical, high, medium, and low severity operations will be displayed.