Use this dialog box to select/view the options for a backup copy schedule of a backup copy schedule policy.
Snap Backup Options
Start New Media
If selected, the option causes the following to occur:Mark media full after successful operation
If selected, the media used for the backup copy operation is marked full after the operation is successfully completed.
Number of simultaneous jobs to run
If selected, allows you to select the number of jobs that are copied at the same time during the backup copy operation.
Allow Maximum
If selected, the maximum number of jobs will be copied at the same time during the backup copy operation.